Moving Bangladesh forward.
The logistics behind the nation's most critical infrastructure — from the first nuclear power plant to the Padma Bridge, and bulk cargo delivered to every district.
Proven on the country's landmark projects.
Ongoing work, completed projects, special operations, nuclear fuel — and an in-depth case study of our fertilizer programme for BCIC & BADC.
Rooppur Nuclear Power Plant
Bangladesh's first nuclear plant — a 2,400 MW VVER-1200 complex. SSLC is the sole authorized logistics agent, handling 60% of all imported cargo.
Rupsha 800 MW Combined Cycle
Equipment imports, transport and on-site unloading for a two-GT26 gas-turbine plant.
Rampal Maitree Super Thermal
Logistics for the 1,320 MW coal-fired plant — a joint Bangladesh–India initiative.
Dhaka Metro Rail
Import, clearance and delivery of rolling stock, track materials and signalling under DTCA's transport plan.
Sirajganj 225 MW Combined Cycle
Heavy equipment imports and inland transport for a 4-unit gas turbine project.
Hazrat Shahjalal Airport Expansion
Import formalities, specialised equipment clearance and delivery for the landmark HSIA expansion.
Planning a project?
Tell us the cargo, the route and the deadline — our project team will map the logistics end to end.
Request a quoteAccomplished projects
A proven record across power, infrastructure, energy and government projects over three decades.
BCIC & BADC Fertilizer Operations
151,175 T of urea, MOP and TSP across four vessel discharges — from mother vessel to corporation warehouses nationwide.
CompletedPadma Multipurpose Bridge
Complex logistics for imported materials and heavy equipment to Bangladesh's landmark river crossing.
CompletedMirsarai Economic Zone
Imports, port clearance and inland distribution for the Bangabandhu Sheikh Mujib Shilpa Nagar.
CompletedJhulda 100 MW Power Plant
Equipment import, clearance, transport and on-site unloading, end to end.
CompletedChittagong 22 Substation Projects
Transformer imports, break-bulk clearance and site deliveries coordinated across 22 substations.
CompletedBhairab LTL Power Plant
Specialised heavy-lift cargo from port to site with full customs and documentation.
CompletedBangladesh Petroleum Exploration (BAPEX)
Logistics and customs for drilling equipment, chemicals and exploration infrastructure.
CompletedChittagong Power Station Unit 2 (BPDB, Raozan)
Full logistics support for the Unit 2 expansion — a critical national power project.
CompletedBanshkhali Power Plant
Import logistics, port operations and inland transport — including oversized cargo and special permits.
CompletedFrom mother vessel to every district.
End-to-end import logistics for Bangladesh's two state fertilizer corporations. Urea, MOP and TSP discharged at anchorage, lightered up the rivers, bagged at the jetty and trucked to warehouses across the country.
One mandate, six handovers.
Between the anchorage and the warehouse, every tonne passes through six controlled stages — each run and supervised by our own teams.
Stage 01Clearance & permits
Customs clearance through our sister C&F concern, M/S Rusani Enterprise — including 78 permissions and direct-delivery permission for MV Syros Island.
Stage 02Mother-vessel discharge
Vessel declaration and handling of the mother vessel at outer anchorage, with bulk cargo grab-discharged straight into lighter vessels.
Kutubdia & Chattogram outer anchorage · Mongla Fairway & HarbariaStage 03Lighterage upriver
Loaded lighters carry the cargo through the river network to the inland jetty closest to each warehouse cluster.
8 inland jettiesStage 04Bagging, stitching & weighing
Once the lighter berths, the bulk fertilizer is packed into bags, stitched and weighed on board — ready for counted, traceable delivery.
Stage 05Jetty unloading
Labour gangs unload the bags from the lighter across the jetty, keeping pace with truck arrivals.
Stage 06Nationwide trucking
Bags are loaded onto trucks and delivered to BCIC and BADC warehouses throughout Bangladesh.
Corporation warehouses, nationwide
Two gateways. Eight inland jetties.
Ocean-going bulk carriers can't reach inland terminals. We discharge at anchorage and move the cargo by lighter to the jetty nearest each destination.
Chattogram
Mongla
Corporation warehouses, nationwide
Bagged at the jetty and trucked onward to the client's own storage network.
- BCIC warehouses
- BADC warehouses
Routes shown for MV Laurel Island and MV Syros Island. MV Syros Island discharged 21,000 T at Kutubdia, then sailed to Mongla Fairway for the balance.
Vessel by vessel.
Two of the four discharges in detail — one for each corporation.
MV Laurel Island
- Cargo
- Granular urea, bulk
- Arrived
- 16 Oct 2023
- Port
- Mongla
- Mother vessel — declaration and discharge into lighters at Fairway & Harbaria anchorage
- Lighterage to Noapara, Khulna, Fultala and Ghorashal jetties
- At the jetty — bagging, stitching, weighing, unloading and truck loading
- Delivery by truck to BCIC warehouses across Bangladesh
MV Syros Island
- Cargo
- MOP fertilizer, bulk
- Arrived
- 13 Oct 2023
- Ports
- Chattogram + Mongla
- Customs clearance through sister concern M/S Rusani Enterprise — 78 permissions and direct-delivery permission
- Lighterage to Bangla Bazar Ghat, Ashuganj, Muktarpur and Amin Bazar from Chattogram; Noapara, Khulna, Fultala and Ghorashal from Mongla
- At the jetty — bagging, stitching, weighing, unloading and truck loading
- Delivery by truck to BADC warehouses across Bangladesh
Complete fertilizer record
All four discharges handled for BCIC and BADC. Bars scale to gross weight.
Field record.
Special operations & case studies
High-complexity challenges solved by SSLC's project team — unconventional, sensitive and oversized cargo.
One of the largest break-bulk consignments for RNPP
Chittagong, Jul 2022 — 106 containers + 13,053 packages, with 350 vehicle deliveries to the jobsite.
Heavy equipment via the Mongla–barge route
From St. Petersburg, Feb 2023 — cargo lashed and welded to barges, then craned at the NPP site.
Reactor pressure vessel & steam generator
Oct 2020 — core RNPP Unit 1 components delivered; Bangladesh joined the World Nuclear Association.
World's most powerful mobile harbour crane
Jul 2020 — 445+ T crane barged from Mongla to RNPP under national-defence security.
Defence cargo returned from UN mission
Jan 2022 — secured unprecedented gearless-vessel berthing at Chittagong for Army/Police/Air Force cargo.
Discharging a 40-ft pipe from an aircraft
Feb 2022 — negotiated with CAAB, used two high loaders to discharge 113,237 KG safely.
Largest single steel-structure shipment for RNPP
Oct 2021 — 9,680 T of steel across 2,390 packages, split between barge and road, two port calls.
Break-bulk vessels handled for Rooppur NPP
Every vessel handled as primary logistics agent. Bars scale to cargo weight.
| # | Vessel | Main cargo | Weight | Packages |
|---|---|---|---|---|
| 1 | CALYPSO | Emergency Cooling System | 726 T | 148 |
| 2 | BBC PERU | High Pressure Heater | 774 T | 89 |
| 3 | BALTIC WINTER | Passive Core System, Liebherr Crane | 226.5 T | 217 |
| 4 | HAPPY DRAGON | Bridge Crane & Parts, HP Heater | 2,010 T | 736 |
| 5 | MV DAISY | Reactor Pressure Vessel & Steam Generator | 2,355.5 T | 370 |
| 6 | MV DONALD | Steam Generators | 1,160 T | 88 |
| 7 | MV MARIA | LHM 800 Mobile Harbour Crane | 1,724 T | 127 |
| 8 | MV JOSEF | Super Heater (Stage 1 & 2) | 548 T | 58 |
| 9 | MV KATHRINE | Steel Structure | 1,355 T | 619 |
| 10 | MV FAZAH-1 | MagnaDense 8S & 20S | 3,600 T | 2,400 big bags |
| 11 | FESCO ULISS | Steel Structures | 9,680 T | 2,390 |
| 12 | MV VICTORY SHINE | Emergency Cooling System | 1,160 T | 174 |
| 13 | MV LANGEOOG | Sandwich Panel, Steel Structures | 4,447 T | 1,360 |
| 14 | MV O.T IDEAAL | UN Vehicles & Equipment | 413.55 T | 41 units |
| 15 | MV BOHWA PIONEER | RNPP Equipment | 1,604 T | 835 units |
| 16 | MV STELLAR MAESTRO | RNPP Equipment | 770 T | 283 |
| 17 | MV SHENG HENG HAI | Sheet Piles | 4,118 T | 1,105 bundles |
| 18 | MV DIANA | Building Materials & NPP Equipment | 5,000 T | 13,053 + 106 ctr |
| 19 | MV DRAGON BALL 2022 | NPP Equipment, Building Materials | 1,980 T | 1,177 |
| 20 | LIBERTY HARVEST-1 | Rolled Steel, Tanks, Gate Valves | 4,716 T | 1,475 |
| 21 | KAMILA / ANKA SUN / YAMAL ORLAN | Multiple Break-bulk Shipments | — | — |
| 22 | MV LAHTA | NPP Equipment | 952 T | 633 |
| 23 | DRAGON BALL 2023 | NPP Equipment | 2,066 T | 2,092 |
| 24 | MV SAPODILLA | NPP Equipment (incl. Generator) | 3,244 T | 734 + bulk |
Nuclear fuel handling
Exclusive agent in Bangladesh for handling and delivering the world's most sensitive cargo — nuclear fuel — to the Rooppur site.
Handled solely by SSLC
24 break-bulk vessels, reactor vessels, steam generators, the LHM 800 crane and a 113,237 KG air charter.
Bangladesh Atomic Energy Commission
Bangladesh Army
Fire Service & Civil Defense
JSC Atomstroyexport
Ready to move your next project?