Moving Bangladesh forward.
The logistics backbone behind the nation's most critical infrastructure — from the first nuclear plant to the Padma Bridge.
Currently executing
Rooppur Nuclear Power Plant
Bangladesh's first nuclear plant — a 2,400 MW VVER-1200 complex. SSLC is the sole authorized logistics agent, handling 80% of all imported cargo.
Rupsha 800 MW Combined Cycle
Equipment imports, transport and on-site unloading for a two-GT26 gas-turbine plant.
Rampal Maitree Super Thermal
Logistics for the 1,320 MW coal-fired plant — a joint Bangladesh–India initiative.
Dhaka Metro Rail
Import, clearance and delivery of rolling stock, track materials and signalling under DTCA's transport plan.
Sirajganj 225 MW Combined Cycle
Heavy equipment imports and inland transport for a 4-unit gas turbine project.
Hazrat Shahjalal Airport Expansion
Import formalities, specialised equipment clearance and delivery for the landmark HSIA expansion.
BCIC & BADC Fertilizer Operations
End-to-end import and nationwide distribution — 150K+ tonnes of urea, MOP and TSP fertilizer.
Accomplished projects
A proven track record across power, infrastructure, energy and government projects over three decades.
Padma Multi Purpose Bridge
Complex logistics for imported materials and heavy equipment to Bangladesh's landmark river crossing.
Mirsarai Economic Zone
Imports, port clearance and inland distribution for the Bangabandhu Sheikh Mujib Shilpa Nagar.
Jhulda 100 MW Power Plant
Equipment import, clearance, transport and on-site unloading, end to end.
Chittagong 22 Substation Projects
Transformer imports, breakbulk clearance and site deliveries coordinated across 22 substations.
Bhairab LTL Power Plant
Specialised heavy-lift cargo from port to site with full customs and documentation.
Bangladesh Petroleum Exploration (BAPEX)
Logistics and customs for drilling equipment, chemicals and exploration infrastructure.
Chittagong Power Station Unit 2 (BPDB, Raozan)
Full logistics support for the Unit 2 expansion — a critical national power project.
Banshkhali Power Plant
Import logistics, port operations and inland transport — including oversized cargo and special permits.
Special operations & case studies
High-complexity challenges solved by SSLC's project team — unconventional, sensitive and oversized cargo.
One of the largest break-bulk consignments for RNPP
Chittagong, Jul 2022 — 106 containers + 13,053 packages, with 350 vehicle deliveries to the jobsite.
Heavy equipment via the Mongla–barge route
From St. Petersburg, Feb 2023 — cargo lashed and welded to barges, then craned at the NPP site.
Reactor pressure vessel & steam generator
Oct 2020 — core RNPP Unit 1 components delivered; Bangladesh joined the World Nuclear Association.
World's most powerful mobile harbour crane
Jul 2020 — 445+ T crane barged from Mongla to RNPP under national-defence security.
Defence cargo returned from UN mission
Jan 2022 — secured unprecedented gearless-vessel berthing at Chittagong for Army/Police/Air Force cargo.
Discharging a 40-ft pipe from an aircraft
Feb 2022 — negotiated with CAAB, used two high loaders to discharge 113,237 KG safely.
Largest single steel-structure shipment for RNPP
Oct 2021 — 9,680 T of steel across 2,390 packages, split between barge and road, two port calls.
54,654 T MOP fertilizer, nationwide
Oct 2023 — 78 permissions, lighter transfer to 8 jetties, then packed and trucked to BADC warehouses.
Break-bulk vessels handled for Rooppur NPP
Every vessel handled as primary logistics agent. Gauges scale to cargo weight.
| # | Vessel | Main Cargo | Weight / Load | Packages |
|---|---|---|---|---|
| 1CALYPSO | Emergency Cooling System | 726 T | 148 | |
| 2BBC PERU | High Pressure Heater | 774 T | 89 | |
| 3BALTIC WINTER | Passive Core System, Liebherr Crane | 226.5 T | 217 | |
| 4HAPPY DRAGON | Bridge Crane & Parts, HP Heater | 2,010 T | 736 | |
| 5MV DAISY | Reactor Pressure Vessel & Steam Generator | 2,355.5 T | 370 | |
| 6MV DONALD | Steam Generators | 1,160 T | 88 | |
| 7MV MARIA | LHM 800 Mobile Harbour Crane | 1,724 T | 127 | |
| 8MV JOSEF | Super Heater (Stage 1 & 2) | 548 T | 58 | |
| 9MV KATHRINE | Steel Structure | 1,355 T | 619 | |
| 10MV FAZAH-1 | MagnaDense 8S & 20S | 3,600 T | 2,400 Big Bags | |
| 11FESCO ULISS | Steel Structures | 9,680 T | 2,390 | |
| 12MV VICTORY SHINE | Emergency Cooling System | 1,160 T | 174 | |
| 13MV LANGEOOG | Sandwich Panel, Steel Structures | 4,447 T | 1,360 | |
| 14MV O.T IDEAAL | UN Vehicles & Equipment | 413.55 T | 41 Units | |
| 15MV BOHWA PIONEER | RNPP Equipment | 1,604 T | 835 Units | |
| 16MV STELLAR MAESTRO | RNPP Equipment | 770 T | 283 | |
| 17MV SHENG HENG HAI | Sheet Piles | 4,118 T | 1,105 Bundles | |
| 18MV DIANA | Building Materials & NPP Equipment | 5,000 T | 13,053 + 106 Ctr | |
| 19MV DRAGON BALL 2022 | NPP Equipment, Building Materials | 1,980 T | 1,177 | |
| 20LIBERTY HARVEST-1 | Rolled Steel, Tanks, Gate Valves | 4,716 T | 1,475 | |
| 21KAMILA / ANKA SUN / YAMAL ORLAN | Multiple Breakbulk Shipments | — | — | |
| 22MV LAHTA | NPP Equipment | 952 T | 633 | |
| 23DRAGON BALL 2023 | NPP Equipment | 2,066 T | 2,092 | |
| 24MV SAPODILLA | NPP Equipment (incl. Generator) | 3,244 T | 734 + Bulk |
Nuclear fuel handling
Exclusive agent in Bangladesh for handling and delivering the world's most sensitive cargo — nuclear fuel — to the Rooppur site.
Handled solely by SSLC
24 break-bulk vessels, reactor vessels, steam generators, the LHM 800 crane and a 113,237 KG air charter.
Bangladesh Atomic Energy Commission
Bangladesh Army
Fire Service & Civil Defense
JSC Atomstroyexport
Ready to move your next project?
From a single container to a nuclear reactor — we have the experience, network and resources for Bangladesh's most complex logistics.